{"id":5612,"date":"2026-02-27T04:26:05","date_gmt":"2026-02-27T01:26:05","guid":{"rendered":"https:\/\/staging.cloudx.sa\/blog\/software-development-companies-in-saudi-arabia-evaluation-criteria\/"},"modified":"2026-07-16T17:23:09","modified_gmt":"2026-07-16T14:23:09","slug":"software-development-companies-in-saudi-arabia-evaluation-criteria","status":"publish","type":"post","link":"https:\/\/cloudx.sa\/en\/blog\/software-development-companies-in-saudi-arabia-evaluation-criteria\/","title":{"rendered":"Software Development Companies in Saudi Arabia: Technical and Commercial Evaluation Criteria Before Contracting"},"content":{"rendered":"<article>\n<section>\n<h2>Why does choosing a software partner directly impact business outcomes?<\/h2>\n<p>Choosing <strong>software companies in Saudi Arabia<\/strong> is not just a technical procurement task, but an operational and financial decision that determines the speed of executing initiatives, data accuracy, and the efficiency of internal teams. When the choice is inappropriate, the cost appears in launch delays, rework, and increased reliance on manual processing that consumes management time and limits scalability.<\/p>\n<p>In Saudi companies, the importance of this decision doubles because many projects are tied to digital sales, accounting integrations, and compliance requirements that cannot be postponed until after launch. Any delay in organizational readiness or weakness in execution quality reflects on the collection cycle, service quality, and customer satisfaction.<\/p>\n<p>The CEO does not need a complex technical proposal, but rather a clear answer to four questions: What business problem will the system solve? What is the realistic timeline? What risks must be controlled early? And how will the outcome be measured during the first 90 days of operation?<\/p>\n<\/section>\n<section>\n<h2>How are software companies in Saudi Arabia evaluated from a technical and commercial perspective?<\/h2>\n<p>Proper evaluation begins by linking the business decision to the technical delivery model, not the other way around. In the Saudi market, the best method is to examine the company across specific dimensions: industry understanding, solution architecture, risk management, and the post-launch operating model. This approach clarifies early on whether the company is suitable for your goals or merely an executor of programming tasks.<\/p>\n<p>Practically, a <strong>software company in Saudi Arabia<\/strong> can be considered suitable when it achieves a balance between three elements: build quality, clarity of governance, and the team&#8217;s ability to translate management goals into operational KPIs that can be tracked monthly.\n        <\/p>\n<h3>Evaluation Dimensions of Interest to the Decision Maker<\/h3>\n<ul>\n<li><strong>Industry Relevance:<\/strong> Does the team understand the actual workflow in your business, or do they propose a generic model that does not reflect operational reality?<\/li>\n<li><strong>Architecture and Integration:<\/strong> Is there a clear plan to connect the system with accounting, point of sale, customer management, or external gateways when needed?<\/li>\n<li><strong>Execution Governance:<\/strong> Are the scope of work, acceptance criteria, and change management documented from the start and subject to periodic review?<\/li>\n<li><strong>Compliance and Data Protection:<\/strong> Does the team clarify responsibilities for data collection, permissions, retention, and incident response?<\/li>\n<li><strong>Post-Launch Continuity:<\/strong> Is there a clear support, operation, and improvement plan instead of delivering the project as a single batch?<\/li>\n<li><strong>Measurability:<\/strong> Are commercial success indicators agreed upon before development starts, rather than after delivery?\n            <\/li>\n<\/ul>\n<p>If the company is still in the phase of determining the appropriate contracting model, reviewing the Practical Guide to Choosing a Software Company in Saudi Arabia helps<br \/>\n            in refining the scope of the decision before entering into detailed negotiations.<\/p>\n<\/section>\n<section>\n<h2>What is the framework for comparing options before contracting?<\/h2>\n<p>Effective comparison means choosing the execution model that achieves the business goal with the least operational risk,<br \/>\n            not choosing the lowest-priced offer at signing. For business managers in Saudi Arabia, the decision becomes clearer when options are<br \/>\n            compared across their impact on compliance, launch speed, modification flexibility, and medium-term reliance on a single provider.<\/p>\n<div class=\"table-wrap\">\n<table>\n<thead>\n<tr>\n<th>Execution Model<\/th>\n<th>When it is Suitable<\/th>\n<th>Early Risk Indicator<\/th>\n<th>Expected Business Impact<\/th>\n<th>Adoption Decision<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Ready-made solution with limited setup<\/td>\n<td>When operations are standard and launch time is a priority<\/td>\n<td>Clear limitations in customization or reporting<\/td>\n<td>Faster start with less flexibility later<\/td>\n<td>Adopt if gaps do not affect the profit model<\/td>\n<\/tr>\n<tr>\n<td>Full custom development<\/td>\n<td>When the core process is the source of distinction or revenue<\/td>\n<td>Uncontrolled scope or changing requirements without priorities<\/td>\n<td>Higher flexibility and larger setup cost<\/td>\n<td>Adopt if governance is strong and acceptance criteria are clear<\/td>\n<\/tr>\n<tr>\n<td>Hybrid approach<\/td>\n<td>When speed is needed along with building a special competitive part<\/td>\n<td>Conflict between ready-made systems and custom modules<\/td>\n<td>Balance between launch time and scalability<\/td>\n<td>Adopt if the boundaries of each part are precisely documented<\/td>\n<\/tr>\n<tr>\n<td>Internal team with external support<\/td>\n<td>When you want knowledge transfer and long-term control<\/td>\n<td>Absence of internal technical leadership capable of guiding<\/td>\n<td>Gradually building an internal technical asset<\/td>\n<td>Adopt if technical decision responsibilities are clearly defined<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>Commercial comparison in Saudi Arabia must include regulatory requirements from the outset. The Zakat, Tax and Customs Authority<br \/>\n            confirms that e-invoicing is implemented in two phases, and this affects integration decisions and operational timing <a href=\"https:\/\/zatca.gov.sa\/en\/E-Invoicing\/Introduction\/Pages\/Roll-out-phases.aspx\" target=\"_blank\" rel=\"noopener\">according to the official implementation phases<\/a>. Likewise, sensitive projects require early alignment with the <a href=\"https:\/\/nca.gov.sa\/en\/regulatory-documents\/controls-list\/ecc\/\" target=\"_blank\" rel=\"noopener\">Essential Cybersecurity Controls ECC 2-2024<\/a> and the <a href=\"https:\/\/nca.gov.sa\/en\/regulatory-documents\/controls-list\/ccc\/\" target=\"_blank\" rel=\"noopener\">Cloud Cybersecurity Controls CCC-2:2024<\/a>.<\/p>\n<p>On the data protection side, the official guide to the Personal Data Protection Law clarifies the scope of obligations on controlling<br \/>\n            and processing entities, which is an important reference when drafting contractual liability clauses <a href=\"https:\/\/dgp.sdaia.gov.sa\/wps\/portal\/pdp\/knowledgecenter\/details\/PDPL\/!ut\/p\/z1\/04_Sj9CPykssy0xPLMnMz0vMAfIjo8ziPR1dzTwMgw2MDMOcTA3MjH39TE29jY0MQsz1w9EUhIZZAhUEGvl6OXoaGwQY60cRo98AB3A0IKTfi5ACoA-MinydfdP1owoSSzJ0M_PS8vUjAlwCfIB2R-HVbWGMoQDTe2AFeNwfnFikX5AbGlHlkxbsqeuoCAACaaGo\/dz\/d5\/L0lHSkovd0RNQU5rQUVnQSEhLzROVkUvZW4!\/\" target=\"_blank\" rel=\"noopener\">from the National Data Governance Platform<\/a>.<\/p>\n<blockquote>\n<p><strong>Key Takeaway:<\/strong> A successful contracting decision in Saudi Arabia starts from the risk and compliance model, then moves<br \/>\n                to technology. The cheapest offer might be the most expensive if it does not protect the workflow and data from day one.<\/p>\n<\/blockquote>\n<\/section>\n<section>\n<h2>What is the phased execution model to reduce risks?<\/h2>\n<p>The best execution model for Saudi company managers is a phased launch based on short-term business outcomes, with firm technical controls<br \/>\n            from the start. This approach prevents scope creep, allows for quick course correction, and gives management actual visibility into the return rather<br \/>\n            than waiting for the project&#8217;s end and discovering costly operational gaps.<\/p>\n<ol>\n<li><strong>Define one main business outcome:<\/strong> Choose a clear goal such as accelerating the order cycle, reducing<br \/>\n                operational errors, or increasing the completion rate.<\/li>\n<li><strong>Establish an operational baseline:<\/strong> Document the current situation with available internal numbers so that comparison after<br \/>\n                launch is objective.<\/li>\n<li><strong>Divide the scope into a first release and subsequent releases:<\/strong> The first release should serve the most important business decision,<br \/>\n                not all requests.<\/li>\n<li><strong>Design integration early:<\/strong> Define data paths between systems before starting to build interfaces.<\/li>\n<li><strong>Approve security and permission controls:<\/strong> Make permission testing, backups, and access monitoring<br \/>\n                part of the delivery plan.<\/li>\n<li><strong>Limited pilot launch:<\/strong> Start with one business unit or branch to test stability and improve procedures.<\/li>\n<li><strong>Monthly impact review:<\/strong> Evaluate results against the baseline, then decide to expand or reprioritize.<\/li>\n<\/ol>\n<p>This model requires a partner capable of combining development and change management within the organization. You can review the available execution scope through <a href=\"\/\">business-oriented software development services<\/a> to link the project plan with the team&#8217;s<br \/>\n            actual operational capacity.<\/p>\n<aside>\n<p>If the contracting decision is still between more than one option, a short diagnostic session can be arranged via a <a href=\"https:\/\/cloudx.sa\/en\/contact-us\/\">request for<br \/>\n                    an initial consultation<\/a> to review technical and commercial risks before signing the contract.<\/p>\n<\/aside>\n<\/section>\n<section>\n<h2>What are the recurring mistakes when contracting and how to prevent their impact early on?<\/h2>\n<p>Most project failures do not stem from the difficulty of the technology itself, but from inaccurate contracting decisions at the beginning. In the Saudi<br \/>\n            market, the most costly mistakes appear when the scope of work is vague, when regulatory requirements are separated from the execution plan,<br \/>\n            or when there is no explicit agreement on success indicators after launch.<\/p>\n<h3>Recurring Mistakes and a Preventive Measure for Each<\/h3>\n<ul>\n<li><strong>Focusing the evaluation solely on price:<\/strong> The preventive measure is to calculate the total cost of ownership over 12 to 24<br \/>\n                months, including support, modifications, and integration.<\/li>\n<li><strong>A general contract without measurable deliverables:<\/strong> The preventive measure is to define precise acceptance criteria for each delivery<br \/>\n                phase.<\/li>\n<li><strong>Postponing security and privacy to the end of the project:<\/strong> The preventive measure is to include permissions,<br \/>\n                auditing, and incident management requirements in the scope document.<\/li>\n<li><strong>Expanding the scope during execution without controls:<\/strong> The preventive measure is a monthly decision committee that approves any change<br \/>\n                with its time and financial impact.<\/li>\n<li><strong>Broad launch without a controlled trial:<\/strong> The preventive measure is a phased launch with a clear rollback plan if<br \/>\n                issues arise.<\/li>\n<li><strong>Relying on one person for technical knowledge:<\/strong> The preventive measure is architectural documentation and organized knowledge transfer<br \/>\n                to the company&#8217;s internal team.<\/li>\n<\/ul>\n<p>To understand how scope control translates into an operational outcome, you can review the <a href=\"https:\/\/cloudx.sa\/en\/case-studies\/how-we-increased-a-restaurant-orders-by-250-through-a-mobile-app\/\">Jaw App Case Study<\/a> as<br \/>\n            an example of linking execution to a clear business indicator instead of settling for a technical delivery.<\/p>\n<\/section>\n<section>\n<h2>What is the practical checklist that managers use before signing?<\/h2>\n<p>An effective practical checklist is one that allows the manager to make a decision within two or three meetings without losing important details. In<br \/>\n            Saudi Arabia, the checklist must cover local compliance elements, contractual governance, and post-launch operational readiness. Any item<br \/>\n            not settled before signing often returns later in the form of delay or additional cost.<\/p>\n<aside>\n<h3>Quick Checklist Before Approving a Software Development Company<\/h3>\n<ul>\n<li>The main commercial goal of the project has been defined in writing and approved by the relevant management.<\/li>\n<li>The scope of the first release, its boundaries, and what has been postponed have been clearly defined.<\/li>\n<li>System integrations have been reviewed and the responsible party for each connection point has been identified.<\/li>\n<li>Data protection, permissions, and backup requirements have been documented.<\/li>\n<li>Phased acceptance criteria that can be tested without subjective judgment have been drafted.<\/li>\n<li>The change management mechanism and its impact on the timeline have been agreed upon.<\/li>\n<li>The post-launch support model and fault response level have been determined.<\/li>\n<\/ul>\n<\/aside>\n<p>Using this checklist before contracting cuts short a large part of the argument later, because it shifts the discussion from general promises to<br \/>\n            trackable commitments. It also makes it easier for management to compare <strong>software companies<\/strong> according to a unified standard instead of<br \/>\n            relying on presentations.<\/p>\n<\/section>\n<section>\n<h2>What is the appropriate step before signing the final contract?<\/h2>\n<p>The most appropriate step is to review the contracting decision as a portfolio of risks and opportunities, not just as a final purchase approval. If the technical,<br \/>\n            commercial, and compliance criteria are documented, signing becomes a logical procedure. However, if integration, operation, or data protection<br \/>\n            responsibilities remain unsettled, it is better to close these gaps before final commitment.<\/p>\n<blockquote>\n<p><strong>Key Takeaway:<\/strong> The right company is not just the one that promises faster delivery, but the one that links delivery to a measurable<br \/>\n                business impact and bears clear responsibility after launch.<\/p>\n<\/blockquote>\n<p>To get an impartial review of your project&#8217;s scope before approving the vendor, you can start an executive discussion via a <a href=\"https:\/\/cloudx.sa\/en\/contact-us\/\">request for a brief assessment<br \/>\n                session<\/a> focusing on risks, timeline, and agreed-upon success criteria.<\/p>\n<\/section>\n<section>\n<h2>Questions Managers Ask Before Choosing a Software Company in Saudi Arabia<\/h2>\n<p>The most useful questions are those that reduce ambiguity before signing, not those that seek general promises. In the context of Saudi<br \/>\n            companies, the precise answer must link regulatory requirements to the business outcome, and clarify each party&#8217;s responsibility in<br \/>\n            execution and operation. The following six questions often cover the most important executive decision points.<\/p>\n<h3>1. When should I choose custom development over a ready-made solution?<\/h3>\n<p>The choice is for custom development when the core process is part of your competitive advantage or a source of profitability. If the<br \/>\n            ready-made solution imposes limitations that disrupt the business model or prevent the required integration, custom is more appropriate. As for standard<br \/>\n            operations that do not offer a competitive difference, a ready-made solution is often faster initially.<\/p>\n<h3>2. What are the minimum items that must be fixed in the contract?<\/h3>\n<p>The minimum includes the scope of the first release, acceptance criteria, change management plan, and post-launch support responsibilities. These<br \/>\n            clauses prevent disputes about what constitutes a completed delivery. It is also preferable to define a mechanism for documenting knowledge and handing it over to the<br \/>\n            company&#8217;s team to ensure continuity.<\/p>\n<h3>3. How do I compare two companies offering very different proposals?<\/h3>\n<p>The correct comparison is through a unified evaluation model based on commercial impact and risk, not on the format of the proposal. Use the same<br \/>\n            examination criteria for all vendors: industry relevance, integration plan, governance, and operating plan. This way, the decision becomes<br \/>\n            objective even if the technical methodologies differ between companies.<\/p>\n<h3>4. Should the internal team be involved before signing the contract?<\/h3>\n<p>Involving the internal team early is essential to reduce the execution gap between what is agreed upon and what can actually be operated. The<br \/>\n            operational team knows the daily bottlenecks that do not always appear in formal meetings. The participation of this team from the beginning<br \/>\n            improves scope accuracy and accelerates system adoption after launch.<\/p>\n<h3>5. What are the early indicators that the project is on the right track?<\/h3>\n<p>The early indicators are adherence to the first release scope, stability of basic integrations, and tangible improvement in an agreed-upon business<br \/>\n            metric. If the project starts adding many functions without operational impact, this is an early warning of losing focus. Monthly review<br \/>\n            is necessary to adjust the course before costs accumulate.<\/p>\n<h3>6. How do I ensure the solution remains appropriate after the company grows?<\/h3>\n<p>Verification is done by testing the scalability in design, and the flexibility of adding new modules without a complete rebuild. The<br \/>\n            ongoing support and development model must also be reviewed so that the system does not turn into a burden after expansion. A good company sets a<br \/>\n            clear growth plan from the initial contracting phase.<\/p>\n<\/section>\n<\/article>\n","protected":false},"excerpt":{"rendered":"<p>Why does choosing a software partner directly impact business outcomes? Choosing software companies in Saudi Arabia is not just a technical procurement task, but an operational and financial decision that determines the speed of executing initiatives, data accuracy, and the efficiency of internal teams. When the choice is inappropriate, the cost appears in launch delays, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5610,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_jet_sm_ready_style":"","_jet_sm_style":"","_jet_sm_controls_values":"","_jet_sm_fonts_collection":"","_jet_sm_fonts_links":"","_joinchat":[],"footnotes":""},"categories":[160],"tags":[],"class_list":["post-5612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-software-company-in-saudi-arabia"],"uagb_featured_image_src":{"full":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f.jpeg",1376,768,false],"thumbnail":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f-150x150.jpeg",150,150,true],"medium":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f-300x167.jpeg",300,167,true],"medium_large":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f-768x429.jpeg",768,429,true],"large":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f-1024x572.jpeg",1024,572,true],"1536x1536":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f.jpeg",1376,768,false],"2048x2048":["https:\/\/cloudx.sa\/wp-content\/uploads\/\u0645\u0639\u0627\u064a\u064a\u0631-\u062a\u0642\u064a\u064a\u0645-\u0634\u0631\u0643\u0627\u062a-\u0628\u0631\u0645\u062c\u0629-\u0641\u064a-\u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629-\u0642\u0628\u0644-\u0627\u0644\u062a\u0639\u0627\u0642\u062f.jpeg",1376,768,false]},"uagb_author_info":{"display_name":"CloudX Team","author_link":"https:\/\/cloudx.sa\/en\/blog\/author\/nourlorabygmail-com\/"},"uagb_comment_info":0,"uagb_excerpt":"Why does choosing a software partner directly impact business outcomes? Choosing software companies in Saudi Arabia is not just a technical procurement task, but an operational and financial decision that determines the speed of executing initiatives, data accuracy, and the efficiency of internal teams. When the choice is inappropriate, the cost appears in launch delays,&hellip;","_links":{"self":[{"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/posts\/5612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/comments?post=5612"}],"version-history":[{"count":1,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/posts\/5612\/revisions"}],"predecessor-version":[{"id":5804,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/posts\/5612\/revisions\/5804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/media\/5610"}],"wp:attachment":[{"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/media?parent=5612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/categories?post=5612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cloudx.sa\/en\/wp-json\/wp\/v2\/tags?post=5612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}